Category Guide · updated 2026-11-25

How to Invest in AI Data Centers: What the Filings Show

Listed REITs and ETFs, non-traded funds with disclosed data center loans and developments, a qualified Regulation A project offering, and private funds sold under Form D: what each security owns, what it costs, how you exit, and what a filing does and does not establish.

AI data center investing: what the SEC filings show

Key facts

  • AltStreet's name-screened register of SEC Form D, Regulation A and Regulation Crowdfunding filings held 264 data center and AI infrastructure issuers on November 25, 2026 (207 pooled funds, 53 operating companies, three DSTs, one Regulation A issuer); their latest reported amounts sum to $24.40 billion before reconciling feeder and parallel vehicles, across 8,240 reported investor entries without deduplication.
  • Issuers filing a first notice: 38 in 2025 and 107 in 2026 through November 25, of which 85 are pooled funds and 47 report no sales yet.
  • Thirteen issuers met AltStreet's screening criteria for possible individual-investor distribution; by the exemption claimed, one is a Regulation A offering open to non-accredited investors, four require qualified purchasers, two are Rule 506(c) accredited-only DSTs and six claim Rule 506(b).
  • Valor Compute Infrastructure L.P.'s Form D of May 15, 2026 reports $2,649,026,842 sold to 1,141 investors, including a feeder fund; Digital Economy Real Estate Partners Data Center Fund I-A LP's of June 10, 2026 reports $905,500,000 to seven investors, cumulative across parallel and feeder funds.
  • BREIT reports $9.1 billion at its share deployed into QTS data center developments in the nine months to September 30, 2026, 100% preleased; Fundrise's Flagship Fund made a 12.55% senior secured bridge loan for a planned campus in Hubbard, Texas.
  • Ark7 AIDC I, LLC's Regulation A Tier 2 offering was qualified on November 23, 2026: Series #VNATI at $138 a share, up to $23,184,000, for an interest in a proposed Georgia project whose land had not been acquired at the circular date.

How can you invest in AI data centers?

Short answer

Through four kinds of security, each with its own eligibility, costs and exit: listed data center REITs and ETFs, non-traded REITs and interval funds that disclose data center positions inside broader portfolios, Regulation A offerings tied to a single project, and private funds sold under Form D. Before choosing among them, decide what you want to own: a landlord, an operating business, a loan, equipment or an interest in a fund. Then read the filing, because the filing shows what the security owns and what it costs, and what it leaves out.

What actually matters

A filing total can include other vehicles

Some funds report amounts that already include feeder or parallel funds. Adding those vehicles' own filings to the parent counts the same money twice.

Qualification is a milestone, not an endorsement

An SEC-qualified Regulation A offering has completed review of its disclosure. Qualification says nothing about whether the project has land, power or a tenant.

Check costs beyond the headline management fee

Performance fees, carried interest, share-class charges, fund operating expenses and sponsor fees at the project level can sit beside the management fee, often in different documents.

Your exit depends on the vehicle's terms

Listed REITs and ETFs trade daily. Interval funds repurchase a set share of the fund at set intervals and prorate when demand exceeds the offer. Private funds and project interests usually return capital only when the sponsor sells or refinances.

What you own

Five claims sold under one theme

What you ownExampleHow it paysHow you exit
A landlord: shares of a REIT or fund that owns leased buildingsEquinix, Digital Realty, Iron Mountain (listed); BREIT's QTS developments (non-traded)Rent under leases; distributions from operationsSell on the exchange, or the non-traded REIT's repurchase program
An operating business that sells computeCoreWeave (Nasdaq: CRWV); Lambda, Crusoe, Nscale (private)Customer contracts for GPU capacity, less hardware, power and financing costsSell listed shares; private shares need company approval and a buyer
A lender to a developer or operatorFundrise Flagship Fund's senior secured bridge loan to a planned Texas campusInterest, and principal at maturity or refinancingThrough the fund's repurchase program; the loan is not transferable by investors
Equipment: GPUs owned or financedCompute Labs GPU vaults; GAIB and USD.AI loan booksRental income or loan interest; new hardware can pressure rental rates and residual valuesVault redemption terms, or a sale of the hardware
A project interest in one developmentArk7 AIDC I, Series #VNATIA share of project cash flow after sponsor fees, once the project earnsUsually none until the sponsor sells or refinances

One example per row from the filings and provider documents in the sources. Check each vehicle's mix of operating properties, development projects and loans in its latest report.

What AltStreet's filing research found

AltStreet keeps a register of issuers in SEC Form D, Regulation A and Regulation Crowdfunding filings whose names include data center, datacenter, AIDC, colocation, hyperscale, compute, GPU, HPC, supercomputer, or digital, cloud or AI infrastructure. This is a name-screened sample, not a comprehensive census; it can miss relevant issuers and include vehicles whose actual exposure requires further verification. REIT accommodation preferreds and names that are only crypto miners are excluded.

Each issuer is counted once by CIK, which removes duplicate issuer records. It does not remove capital that appears in more than one vehicle's total. On November 25, 2026 the register held 264 issuers: 207 pooled funds, 53 operating companies, three Delaware statutory trusts and one Regulation A issuer. Their latest filings report amounts that add up to $24.40 billion, a raw sum of reported figures that is not reconciled for feeders and parallel funds, and 8,240 reported investor entries across the filings, without deduplication.

What the register does show clearly is the pace of new vehicles. Issuers filing a first notice numbered 38 in 2025 and 107 in 2026 through November 25. Most of the 2026 cohort are pooled funds, and 47 of the 107 report no sales yet.

Register

Issuers by year of first notice

Year of first noticeNew issuersPooled fundsOperating companiesOtherReported sold by the cohort (raw sum)
2021231841 DST$583 million
202220164$8.65 billion
202313112$3.55 billion
202428262$3.68 billion
202538326$4.84 billion
2026 (to Nov. 25)10785201 DST, 1 Reg A$1.20 billion; 47 report no sales yet

AltStreet register read November 25, 2026. Amounts are each issuer's latest reported cumulative figure, summed without reconciling feeder and parallel vehicles; 2022 includes the three Blue Owl Digital Infrastructure Fund III partnerships, which together report $6.06 billion. 2026 runs to November 25.

Read the clarification

Three large fund filings and what their totals include

Issuer (Form D date)Reported soldReported investorsWhat the filing says about the number
Valor Compute Infrastructure L.P. (May 15, 2026)$2,649,026,8421,141Includes a feeder fund; excludes the general partner's contribution
Digital Economy Real Estate Partners Data Center Fund I-A LP (June 10, 2026)$905,500,0007Cumulative across the issuer, parallel funds and feeder funds, including general partner investment; no sales commissions reported, with a management fee and carried interest stated separately
Blue Owl Digital Infrastructure Fund III-C LP (Jan. 23, 2025)$1,880,873,3488Section 3(c)(7) fund for qualified purchasers; the minimum investment field reads $0, which is not an advertised ticket size

Figures as filed. Blue Owl's III-A and III-B partnerships report $2,638,797,888 to 223 investors and $1,542,515,764 to 120; whether any investor appears in more than one partnership is not stated.

Which issuers might reach individual investors

Thirteen issuers met AltStreet's screening criteria for possible individual-investor distribution: 100 or more reported investors with reported sales, a Delaware statutory trust, or a Regulation A or Regulation Crowdfunding offering. Eligibility and availability require vehicle-specific verification. The exemption each one claims narrows who may legally invest, as the table shows; none of it establishes that an offering is open today.

Screening candidates

The 13 screened issuers by the exemption they claim

Access implied by the exemptionIssuersWhat it means
Open to non-accredited investors (Regulation A Tier 2)Ark7 AIDC IAnyone may invest; non-accredited individuals are limited to 10% of the greater of annual income or net worth unless the securities are listed
Qualified purchasers (Section 3(c)(7))Valor Compute Infrastructure; BGA Private Opportunities Fund, Digital Infrastructure Series; Blue Owl Digital Infrastructure Fund III-A and III-BGenerally $5 million or more of investments for an individual; institutional in practice
Accredited only (Rule 506(c))Cove Debt Free Tacoma Data Center DST; CS1031 California Data Center DSTEvery purchaser must be accredited, with verification
Mostly accredited (Rule 506(b))StratCap Digital Infrastructure REIT; Strategic Data Center Fund; Horizon Data Center Investors; Tiny Fund II; Small World Capital AI Infrastructure Fund V; BREX Net Lease Data Center I DSTUp to 35 sophisticated non-accredited purchasers are permitted; whether a sponsor admits any is a policy question the filing does not answer

Exemptions as claimed on each issuer's latest filing in AltStreet's register, November 25, 2026. Actual subscription policies, minimums and fundraising status are not established by the filing.

Access routes in AltStreet's record

RouteWho can use itHow it worksEvidenceCaution
Listed data center REITs and ETFsAny investor with a brokerage accountBuy shares of a data center REIT or an ETF; compare the ETFs in the table belowNareit's data center sector: Equinix, Digital Realty, Iron MountainAn ETF's label does not define its exposure; read the holdings
Non-traded REITs and interval fundsMost investors, subject to each fund's minimums and suitability rulesSubscribe through the sponsor or an adviserBREIT and Fundrise's Flagship Fund disclose data center developments and loans; terms belowYou own the whole fund; repurchases are limited and can be prorated or suspended
Regulation A project offeringsAnyone; Tier 2 limits for non-accredited individualsSubscribe on the sponsor's platform after reading the offering circularOne qualified offering identified in AltStreet's register: Ark7 AIDC INo trading market; the project's readiness is in the circular, not the qualification
Private funds and DSTsAccredited investors or qualified purchasers, depending on the exemptionThrough the sponsor, a placement agent or a wealth platform, with the full offering documents264 issuers in the register; exemptions aboveA past Form D is not a live offer; a data center name is not evidence of AI exposure
GPU equipment, GPU-backed lending and tokensVaries; some products exclude US personsGPU vaults, GPU-collateralized notes, staking and node productsAltStreet reviews of Compute Labs, GAIB, USD.AI and AethirHardware value and rental rates can fall; token rewards carry the token's price risk

Public markets

Three listed ETFs and what they say they hold

FundStated exposureExpense ratioSource and date
Global X Data Center & Digital Infrastructure ETF (DTCR)Data center and other digital infrastructure companies0.50%Global X, data as of November 24, 2026
iShares U.S. Digital Infrastructure and Real Estate ETF (IDGT)Data centers, towers and communications infrastructure; 13.13% in data center REITs0.37%iShares fact sheet, September 30, 2026
VanEck Data Center Supply Chain ETF (RACK)Companies in data center construction and operation supply chains0.50%VanEck, November 25, 2026

Check the issuer's current fact sheet and your broker's commissions and spreads before comparing.

Non-traded funds with disclosed data center exposure

Two large platforms disclose data center positions inside broader funds, one as an owner and one as a lender. BREIT's prospectus supplement of October 22, 2026 says it deployed $9.1 billion, at BREIT's share, into QTS data center developments in the nine months to September 30, 2026, and that those developments were 100% preleased, substantially all to investment-grade tenants. A BREIT investor owns the whole fund and cannot allocate to QTS. BREIT states minimums of $2,500 for S-2, T-2 and D-2 shares and $1 million for Class I, a 1.25% annual management fee on NAV, and a 12.5% performance participation above a 5% hurdle with a high-water mark and catch-up, plus share-class selling and servicing charges.

Fundrise's Flagship Fund made a senior secured bridge loan for development of a planned 5 GW campus in Hubbard, Texas, at a 12.55% fixed current-pay rate, according to a February 19, 2026 investor update. The fund is lending to a developer, and the loan rate is not the fund's return. The fund's May 1, 2026 prospectus states a $1,000 initial minimum, a 0.85% management fee and 1.78% total annual operating expenses, and quarterly repurchase offers for at least 5% of shares, prorated when oversubscribed. Interval funds in general repurchase at intervals of three, six or twelve months, for 5% to 25% of shares. The loan's current status and weight in the portfolio were not established for this guide.

Can non-accredited investors buy into a single project?

One qualified offering identified in AltStreet's register allows it. Ark7 AIDC I, LLC's Regulation A Tier 2 offering received SEC qualification on November 23, 2026. The table sets out what its November 18 circular discloses and what it leaves open. AltStreet's register identified no live project-specific Regulation Crowdfunding offering on November 25, 2026.

Case

Ark7 AIDC I, Series #VNATI: offering versus project

ItemWhat the circular disclosesWhat it does not establish
SecuritySeries interests at $138 a share, up to $23,184,000, Regulation A Tier 2A trading market; the series has none
What the money buysAn interest in Soperton Data Center I, LLC, the project companyTitle to land: the site had not been acquired at the circular date
ProjectProposed Georgia site, 10 MW of utility power, 7.6 MW of tenant IT loadAn interconnection agreement, a tenant, a lender or a construction budget
Economics and controlUp to 26% of project economics at full funding; 66.67% of Class A voting powerThat voting control means a majority of profits; it does not
FeesSourcing fee up to 6% of gross proceeds; asset management fee of 15% of defined free cash flow available for distributionThe full cost, which depends on the project-level agreements
MinimumNo minimum subscription per investor statedAn executable minimum on the platform

Offering circular of November 18, 2026 and the SEC notice of qualification of November 23, 2026. Later supplements, live subscription terms and project milestones were not reviewed. AltStreet's November 24 article covers the economics in detail.

Private funds, DSTs and accredited access

Most of the vehicles in the register raise under Rule 506. Rule 506(c) offerings may be advertised and must verify that every purchaser is accredited; Rule 506(b) offerings may not be advertised and may admit up to 35 sophisticated non-accredited investors, so not every Regulation D offering is accredited-only. Funds relying on Section 3(c)(7) require qualified purchasers.

Delaware statutory trusts package one property or a small portfolio for accredited investors, often for 1031 exchanges. BREX Net Lease Data Center I DST's amendment of November 19, 2026 claims Rule 506(b), states a $100,000 minimum and reports $18,871,675 sold to 48 investors. The filing does not describe the property, tenant or lease, or whether the facility serves AI workloads. Before treating any private vehicle as investable, obtain the private placement memorandum, governing agreement, subscription documents, fee schedule and property or loan documents, and confirm with the sponsor that it is raising.

GPU ownership, leasing and tokens

Some products sell the hardware rather than the building: GPU vaults, GPU-collateralized notes and tokens built on them. CoreWeave's quarterly report for June 30, 2026 names the risks from the operator's side, including the cost of replacing infrastructure, useful-life estimates for GPUs that may prove inaccurate, and customers failing to perform. Products that pay from GPU rental carry the same exposure, and new hardware can pressure rental rates and residual values. AltStreet's GPU financing guide and its reviews of Compute Labs, GAIB, USD.AI and Aethir read the collateral, redemption terms and control of each vault. This research did not establish a tokenized data center offering that gives US retail investors verified property ownership.

Filings

How to read a Form D before you believe a pitch

Field or documentQuestion it answersHow to use it
Legal issuer and related personsWhich entity takes the money, and who controls it?Separate the brand, sponsor, manager, feeder and property company
Exemption and Investment Company Act exclusionWho may legally subscribe?Keep accreditation and qualified-purchaser status as separate facts
Date of first sale and filing dateA new vehicle, a new sale or an amendment?Use the first notice to place the vehicle in time
Total amount sold and its clarificationIssuer-only or family-wide?Read the clarification before adding totals together
Number of investorsWhat the issuer reportsTreat it as reported investors, not unique people
Sales compensationDistribution costs disclosedNot the fee schedule; management fees and carry are in the offering documents
Offering circular, PPM or prospectusWhat the security owns and pays forWaterfall, fees, leverage, conflicts, reporting and exit terms
Executed project documentsSite control, power and a paying tenantDistinguish signed, conditional, in negotiation and projected

What the filing leaves unanswered

A Form D reports that an issuer exists, which exemption it claims, and what it reports sold and to how many investors. It does not show whether a project owns its land, has interconnected power or a tenant, or has spent the money. The questions below are the ones to take to the sponsor. They are a diligence framework, not findings about any named issuer.

Diligence

Questions to ask and the evidence to request

RiskAskEvidence
Development readinessDoes the vehicle own the site, hold an option or plan to buy it?Deed or purchase agreement, closing conditions, construction budget
PowerHow much power is contracted, by when, on what conditions?Utility agreement, interconnection status, who funds upgrades
CapacityIs the megawatt figure utility input, IT load, planned or energized?Engineering definitions and commissioning reports
TenantWho signed, who guarantees rent, when does it start?Executed lease, credit support, termination rights
DebtWho is senior and what happens at maturity?Loan documents, covenants, collateral
Sponsor economicsWhat goes to the sponsor before and at sale?Complete waterfall and affiliate agreements
Valuation and distributionsIs the price a trade, appraisal, NAV or projection, and are distributions earned?Valuation policy; financial statements beside distribution notices
LiquidityCan I sell, redeem, or only wait?Transfer restrictions, repurchase limits, suspension provisions

How this guide is built

How this guide is built

Register figures come from AltStreet's name-screened register of SEC Form D, Regulation A and Regulation Crowdfunding filings, read November 25, 2026. Issuers are counted once by CIK; amounts and investor counts are each issuer's latest reported figures, summed without reconciling feeder and parallel vehicles or deduplicating investors. Fund and offering terms are quoted from the filings and provider documents in the sources, each with its date, and change over time. A historical filing does not establish a live offer.

Frequently asked questions

Can non-accredited investors invest in AI data centers?

Yes, through listed REITs and ETFs, non-traded funds that disclose data center positions, and Regulation A offerings, where non-accredited individuals are limited to 10% of the greater of annual income or net worth in Tier 2. Funds under Rule 506(c) or Section 3(c)(7) are closed to them.

What is the minimum investment in a data center?

One share of a listed REIT or ETF. Non-traded funds set their own: BREIT states $2,500 for most share classes and Fundrise's Flagship Fund $1,000. Private vehicles are higher; BREX Net Lease Data Center I DST states $100,000.

Can I buy a share of a single AI data center?

AltStreet's register identifies one qualified Regulation A offering tied to a single project, Ark7 AIDC I, whose site had not been acquired at the circular date. Delaware statutory trusts offer single-property exposure to accredited investors.

What is the difference between a data center REIT and a private fund?

A listed REIT reports to the SEC each quarter and trades daily. A private fund raises under Form D, invests at the manager's discretion, discloses its fees in offering documents and returns capital when it sells assets.

Does Fundrise invest in AI data centers?

Its Flagship Fund made a senior secured bridge loan for a planned campus in Hubbard, Texas, per a February 19, 2026 update. That is a loan to a developer, not ownership of a data center.

Does BREIT own data centers through QTS?

BREIT reports deploying $9.1 billion at its share into QTS developments in the nine months to September 30, 2026. Investors own the whole fund and cannot allocate to QTS alone.

What fees do private data center funds charge?

Form D rarely says. Management fees, carried interest above a hurdle and, in project vehicles, sourcing and asset management fees are set out in the offering documents. Ask for the complete fee schedule and waterfall.

How do I get my money out of a private data center investment?

It depends on the vehicle's terms. Private funds and project interests usually return capital when the sponsor sells or refinances; interval funds and non-traded REITs repurchase limited amounts at set intervals; listed securities sell on the exchange.

Are data center investments safe?

Do not assume principal protection; examine the specific security and any guarantee. Development stage, tenant concentration, hardware obsolescence, sponsor fees and exit terms are the risks to test.

Does a Form D mean the SEC approved the investment?

No. A Form D is a notice of an exempt offering and is not reviewed for approval. Regulation A qualification means the SEC completed its review of the disclosure, which is not an endorsement.

This guide describes access routes, filings and dated terms. It is not investment, legal or tax advice and does not recommend any fund, sponsor, platform or security. Register figures are issuers' own reported amounts, summed as filed; provider fees and minimums are as published on the dates given.

Private fund interests, project series, DST interests and GPU-backed products are illiquid and can lose their full value. Obtain current offering documents, confirm eligibility and fundraising status with the sponsor, and take tax advice on the vehicle before committing capital.

Sources

  1. AltStreet: Data center and AI infrastructure fundraising in the filings (register read November 25, 2026) (AltStreet)
  2. AltStreet: AI Infrastructure & Compute category (AltStreet)
  3. AltStreet: Ark7 qualifies a $23.2 million data center offering (November 24, 2026) (AltStreet)
  4. AltStreet: GPU financing guide (AltStreet)
  5. AltStreet: How to invest in AI infrastructure (the broader value chain) (AltStreet)
  6. Valor Compute Infrastructure L.P., Form D filed May 15, 2026 (SEC EDGAR)
  7. Digital Economy Real Estate Partners Data Center Fund I-A LP, Form D filed June 10, 2026 (SEC EDGAR)
  8. Blue Owl Digital Infrastructure Fund III-C LP, Form D filed January 23, 2025 (SEC EDGAR)
  9. Blackstone Real Estate Income Trust, prospectus supplement, October 22, 2026 (SEC EDGAR)
  10. BREIT offering terms (accessed November 25, 2026) (Blackstone)
  11. Fundrise investor update, February 19, 2026 (Flagship Fund bridge loan, Hubbard, Texas) (Fundrise)
  12. Fundrise Real Estate Interval Fund, prospectus dated May 1, 2026 (SEC EDGAR)
  13. Ark7 AIDC I, LLC, notice of qualification, November 23, 2026 (SEC EDGAR)
  14. Ark7 AIDC I, LLC, EDGAR filing index (Form 1-A and amendments, offering circular of November 18, 2026) (SEC EDGAR)
  15. BREX Net Lease Data Center I DST, Form D/A filed November 19, 2026 (SEC EDGAR)
  16. CoreWeave, Inc., Form 10-Q for the quarter ended June 30, 2026 (SEC EDGAR)
  17. Global X Data Center & Digital Infrastructure ETF (DTCR), product page, data as of November 24, 2026 (Global X)
  18. iShares U.S. Digital Infrastructure and Real Estate ETF (IDGT), fact sheet, September 30, 2026 (BlackRock)
  19. VanEck Data Center Supply Chain ETF (RACK), product page (accessed November 25, 2026) (VanEck)
  20. Investor.gov: Real estate investment trusts (REITs) (SEC)
  21. SEC: Offering pathways (June 12, 2024) (SEC)
  22. SEC: Regulation A overview (updated November 14, 2024) (SEC)
  23. SEC: Rule 506(c) of Regulation D (updated March 17, 2026) (SEC)
  24. SEC: Rule 506(b) of Regulation D (June 13, 2024) (SEC)
  25. SEC Form D (SEC)

Part of AltStreet's AI Infrastructure & Compute guides.